Skip to main content

All Access Subscription

Get unlimited access to our full publication and article library.

Get Access Now

Interested in Group Sales? Learn more

No ED cuts its average door-to-doc time from 93 minutes to 20 minutes by accident. The success story at Memorial Hermann Memorial City Medical Center in Houston was the result of discovering a patient flow model at another facility that was superior to theirs, and then continuing to search out additional models to come up with their own system that best addressed their specific needs.

Critical Path Network: ED slashes average wait time by more than an hour